Wednesday, December 27, 2006

Phased Migration of Centum V, Centum XL

Phased migration for the CENTUM V, CENTUM-XL is a three-step upgrade method on a component basis, which reduces the required investment and manpower, and shortens the upgrade period.


Upgrading of HMI brings in the latest HMI environment and network capability, surely one of the most important issues.


By utilizing the existing field wiring and I/O cards, the latest control functions are provided, while greatly improving performance and application capacity.
Step 3 : Upgrading of I/Os

Using existing field wiring, the latest I/Os are provided with full compatibility of functions, interface and cabinet layout.


No comments: